The Mechanisation and Automation of the IBS Construction Approach in Malaysia

Main Article Content

Siti Syariazulfa Kamaruddin
Mohammad Fadhil Mohammad
Rohana Mahbub
Khairani Ahmad

Abstract

The objective of the main research is to investigate the current state of implementation of mechanisation and automation in the Industrialised Building System (IBS). The aim of this paper, however, is to provide an overview of the implementation of mechanisation and automation in the IBS construction approach. Questionnaire surveys and semi-structured interviews were conducted to collect the viewpoints among contractors and manufacturers of IBS to ensure the richness of the data collected. The results illustrated that although most respondents agreed on most critical issues in the implementation of mechanisation and automation, they were not ready to move forward. These responses were quite consistent across the professions.

Article Details

How to Cite
[1]
Kamaruddin, S.S., Mohammad, M.F., Mahbub, R. and Ahmad, K. 2018. The Mechanisation and Automation of the IBS Construction Approach in Malaysia. Asian Journal of Environment-Behaviour Studies. 3, 10 (Aug. 2018), 167–177. DOI:https://doi.org/10.21834/aje-bs.v3i10.324.

References

Azman et al., (2012). Comparative Study on Prefabrication Construction Process, International Surveying Research Journal (ISrJ), 45-58.

Ball, M. (1999). Chasing a snail: innovation and housebuilding firm's strategies. Informaworld, Housing Studies 14:(1) , 9-22.

Barlow, J. (1999). From craft production to mass customisation: innovation requirements for the UK housebuilding industry. Informaworld, Housing Studies 14:(1) , 23-42.

Begum R.A, Satari S.K, Pereira J.J (2010). Waste generation and recycling: comparison of conventional and industrialized building systems. American Journal of Environmental Sciences. 6(4), 383–8.

Burwood, S, Poul, J. (2005). Modern Methods of Construction: evolution or Revolution: A BURA Steering and Development Forum Report. London: British Urban Regeneration Association.

BURA (2005). Modern Methods of Construction: Evolution or Revolution? British Urban Regeneration Association (BURA): Steering and Development Forum, London.

CABE. (2004). Design and modern methods of construction: review. London: CABE.

CIDB (2003). Industrialized Building System (IBS) Roadmap 2003-2010. Construction Industry Development Board (CIDB), Kuala Lumpur.

CIDB (2006). Industrialised Building Systems in Malaysia. CIDB Press.

CIDB (2007). Construction Industry Master Plan (CIMP) 2006-2015, Kuala Lumpur, Malaysia.

CIDB (2010) Industrialised Building Systems (IBS) Roadmap 2011-2015, Construction Industry Development Board (CIDB) Malaysia, Kuala Lumpur.

Gibb, A.G. (1999). Off-site Fabrication – Pre-assembly, Prefabrication and Modularisation, Whittles Publishing Services, Caithness, 262.

Hamzah NH, Nafi MNA, Yacob J, Ashari AH, Daud Z, Sulain AS (2010). A study on the acceptance of IBS in construction industry in Kelantan: application of logistic regression analysis.

Idoro, (2008). Influence of Channels of Recruitment on Performance of Construction Workers in Nigeria. Proceedings of the West Africa Built Environment Research (WABER) Conference 2011 (19-21 July 2011, Accra, Ghana.

Idrus, A., Hui, N.F.K and Utomo, C. (2008). Perception of Industrialized Building System (IBS) Within the Malaysian Market. International Conference on Construction Building Technology (ICCBT), 75-92

Jaillon, L., C. S. Poon and Y. H. Chiang. (2009). Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. Waste Management 29 (1). 309-320.

Kamar et al. (2007). Industrialised Building System: Current shortcomings and the vital role of R&D. Master Builders Association Malaysia, 2nd quarter, 62-65. Malaysia Construction Research Journal, 2 (1), 20-25.

Kamar, K,A, M, Hamis, Z,A and Dzulkalnine, N (2012). Industrialised Building System (IBS) Construction: Measuring the perception of Contractors in Malaysia.

Kibert C, J. (2007). The next generation of sustainable construction. Building Research & Information. 35(6). 595–601.

Mahbub, R. (2012). Readiness of a Developing Nation in Implementing Automation and Robotics Technologies in Construction: A Case Study of Malaysia. Civil Engineering and Architecture, USA. 6(7).

Morton, R. (2002). Construction UK: Introduction to the Industry, Blackwell Science, Oxford.

Ngowi, A.B., Pienaar, E., Talukhaba, A. and Mbachu, J., (2005). The globalization of the construction industry- a review, Building and Environment 40, 135-141.

Nadim, W. and Goulding, J.S. (2009). Offsite production in the UK: the way forward? A UK construction industry perspective, Emerald, Construction Innovation,10, 181-202.

O’Brien, M., Wakefield, R. and Beliveau, Y. (2000). Industrializing the Residential Construction Site, Center for Housing Research, Virginia Polytechnic Institute and State University, Blacksburg, V.

Pan, W., Gibb, A.G. F., and Dainty, A. R. J. (2007). Perspectives of UK house builders on the use of offsite modern methods of construction. Construction Management and Economics, 25, 183–194.

Richard, R. B. (2005). Industrialised Building Systems: Reproduction Before Automation And Robotics, Automation In Construction, 14 (2005), 442– 451.

Roskrow, B. (2004). Design and deliver. Housebuilder pp. 18-20. — September.

Slaughter, E.S., (1998). Models of construction innovation. Journal of Construction Engineering and Management, 124(3), 226-232.

Tam V.W.Y, Tam C.M, Zeng S.X, Ng W.C.Y (2007). Towards adoption of prefabrication in construction. Building and Environment. 42(10). 3642–54.

Warszawski, A. (1985). Industrialised and Automated Building Systems. Technion-Israel Institute of Technology,E and FN Spoon.

Warszawski, A. (1999).Industrialised and automated building systems. Technion-Israel Institute of Technology, E and FN Spon.

Yee, A. A. 2001. Social and environmental benefits of precast concrete technology. PCI Journal 5-6. 14-20.